Bonacci Infrastructure provided civil and structural design services for the Ban Houayxai Gold-Silver Operation in Laos.
Design services included the process plant and run-of-mine (ROM) bulk earthworks, plant roads and stormwater drainage, plant sedimentation pond and stormwater containment pond, 60 metre span pipe bridge structural design, gold store structural design, and hydraulics / hydrology for the tailings pipeline gully and creek crossings.
As part of the works, Bonacci Infrastructure delivered the design for an impressive soil nailed cut with a retained height of 12 metres.



Similar Projects
-
Robina Hospital
Queensland Health
-
Bonalbo Multi Purpose Service Health Facility
New South Wales Health
-
Ergon Energy Glenmore Road Depot
Ergon Energy