Exxon Mobil PNG LNG

Bonacci Infrastructure provided all major temporary works for the Clough Curtain Joint Venture as part of the Exxon Mobil PNG LNG project.

Client: Clough Curtain Joint Venture
Location: Papua New Guinea

Bonacci Infrastructure provided all major temporary works for the Clough Curtain Joint Venture as part of the Exxon Mobil PNG LNG project.

Works included the design of two new piling leaders which were fitted to a Manitowoc 16 000 crane, a cable guided ferry system across the Mubi River, barge mounted piling frames, temporary works slope stability assessments (including geogrid slope reinforcing), and an extensive peer review of a 116 metre steel truss bridge launch procedure which identified and rectified critical flaws in the structure and launch methodology.

close

Similar Projects

  • close
    Broken Hill Pipeline – Murray River Offtake Pump Station

    John Holland Group

  • close
    Wivenhoe Dam Upgrade

    Wivenhoe Alliance

  • close
    Wiggins Island Coal Export Terminal – Reclaim Tunnels

    Wiggins Island Coal Export Terminal Pty Ltd