RG Tanna Wharf

Bonacci Infrastructure provided continuous design and technical support for the duration of the RG Tanna Wharf project. Design activities included the main piling frame which cantilevered 14 metres from a previous bent, and the dolphin concrete form system (130 cubic metres in a single pour) which accommodated two different dolphin configurations.

Client: Golding Walz Joint Venture
Location: Gladstone, Queensland, Australia

Bonacci Infrastructure provided continuous design and technical support for the duration of the RG Tanna Wharf project. Design activities included the main piling frame which cantilevered 14 metres from a previous bent, and the dolphin concrete form system (130 cubic metres in a single pour) which accommodated two different dolphin configurations.

The upper and lower piling frame gates were hydraulically operated, with the lower gate concealed within the floor frame. The upper gate was fully detachable for use in different configurations, whilst the entire head frame was detachable for reverse use.

close

Similar Projects

  • close
    Gold Coast Cultural Precinct – Green Bridge

    City of Gold Coast Council

  • close
    Broken Hill Pipeline – Murray River Offtake Pump Station

    John Holland Group

  • close
    Wivenhoe Dam Upgrade

    Wivenhoe Alliance