Bonacci Infrastructure was engaged as the temporary works consultant for the construction of the South Pine River rail bridge. The rail bridge construction included the installation of 50 tonne precast planks over the river. The Contractor opted for the construction of a temporary bridge to manage project time constraints and the need to mitigate uncertainty.
Bonacci Infrastructure delivered the design and documentation for the temporary bridge which could accommodate the operation of a 280 tonne crawler crane.